FACILITY AREA
 

Required area of installation in automated systems: Minimum 4000 m2 (600 m2 for machinery and equipment, 1600 m2 of dry area, dry ready storage area 1200 m2, aggregate storage area 500 m2, empty pallet holding area 100 m2) The installed area is calculated together with the concrete batching plant. The total transformer or generator power required to be installed in automated systems must be 150 kVA. The installed capacity is 105 kw. Concrete plant is included. Number of personnel required to operate the factory in automatic systems: 2 people (1 operator and 1 forklift driver).


GENERAL INFORMATION ABOUT THE AREA TO BE ESTABLISHED

NOVAL INC. the machine, empty pallet holding and fresh product drying area in order to protect from bad weather conditions to establish a minimum 600 m2 closed area is recommended. buyer should be prepared the concrete infrastructure of the area where the factory is established. NOVAL INC. prepare a detailed measurement plan for the area where the infrastructure will be established. The quality of concrete and the loads that it will carry, namely the static calculation and the strength of the reinforced concrete structure, must be carefully calculated and prepared by civil engineers. The electrical installation up to the control panel of the factory belongs to the receiver. It is necessary to have water plant and compressed air compressor and installation to the mixer unit of the factory.

In order to start the installation, concrete, aggregate, plumbing and water, concrete suitable for the concrete project, at least 500 lt capacity compressed air compressor, forklift, bucket, telescopic crane with at least 10 tons lifting capacity, power and distributor electrical panel with the desired power and operators will be ready to operate the equipment. Personnel assigned by the vendor at the time of installation in accordance with the rules of occupational safety and health (electrical and electrical equipment provided with grounding and isolation, machine and machinery with safe and suitable hand tools, safe scaffolding and platforms, etc.) and work safety equipment (helmet, steel toe cap and soles, non-conductive rubber shoes, suitable for working in high places, etc.) It is the buyer's responsibility to make sure that the work is done and to supervise the work done in this installation in terms of occupational health and safety and to remedy the negativities that occur as soon as possible
.